Now that the insulation is complete, the Drywall contractor has begun! After just a few days of work, all of the walls and ceilings are up on the 2nd floor, and most of the ceilings and the top half of the walls are up on the 1st floor. They installed Durock for the showers, because they’re supposed to be mold and mildew resistant.
With the walls up, it’s really starting to look like a house!!